What Is Embodied Carbon & Why It Rivals Operational Emissions

Embodied carbon is the CO₂ emitted to mine, manufacture and transport building materials plus end‑of‑life impacts. For new Australian buildings it already equals 10–20 years of operational emissions.citeturn0search1

The Australian Baseline

Infrastructure Australia forecasts 37–64 Mt CO₂e of upfront embodied carbon annually through 2030 unless industry acts.citeturn0search7

Hotspot #1 – Concrete & Cement

Ordinary Portland Cement (OPC) alone contributes ~8 % of global CO₂. Replacing 40 % of OPC with fly‑ash or slag can cut a project’s embodied carbon by 15 %.citeturn0search3

Hotspot #2 – Structural Steel

Basic Oxygen Furnace (BOF) steel carries 1.8 t CO₂e/t. Switching to Electric Arc Furnace (EAF) steel powered by renewables drops this to 0.3 t CO₂e.

Hotspot #3 – Aluminium & Façades

Aluminium is energy‑intensive but infinitely recyclable. Specify high‑recycled‑content curtain‑wall systems to halve façade emissions.

Hotspot #4 – Services & Fit‑out

MEP systems and tenant fit‑outs can add 15 % to upfront carbon. Choose modular MEP skids and low‑carbon carpets to curb this hidden load.

Strategy 1 – Lean Design & Material Efficiency

Structural optimisation and modular grids can save 5–10 % of concrete and steel without affecting performance.

Strategy 2 – Low‑Carbon Material Substitutions

  • Low‑carbon concrete with SCMs or geopolymer binders
  • Green steel from EAFs or H₂‑DRI
  • Timber & bio‑based panels for non‑load‑bearing walls

Strategy 3 – Reuse & Circular Economy

Adelaide’s “Uniting on Second” project is cataloguing materials for future reuse via a digital material bank, cutting both cost and carbon.citeturn0news19

Strategy 4 – Specify EPDs & Set Benchmarks

Mandate product‑specific Environmental Product Declarations (EPDs) and aim for a ≤ 6 kg CO₂e/m² upfront carbon benchmark on major elements.

Strategy 5 – Early LCA & Digital Tools

Running a whole‑building Life‑Cycle Assessment (LCA) at concept stage unlocks the biggest savings. Tools like One Click LCA integrate with BIM to give instant feedback.

Case Study – Quay Quarter Tower, Sydney

Reusing 65 % of the existing core saved 12,000 t CO₂e and AU$130 M.citeturn0search9

Policy Drivers

  • NCC 2025 set to include embodied‑carbon reporting thresholds.citeturn0search0
  • Green Star Buildings v1.1 awards up to 9 points for upfront carbon reductions.

Quick‑Reference Table: Carbon Savings by Strategy

StrategyTypical % CO₂e Reduction
Low‑carbon concrete (40 % SCM)12–15 %
Green steel (EAF)5–8 %
Structural optimisation5–10 %
Material reuse5–12 %
Timber substitution3–7 %

Ready to Tackle Embodied Carbon?

EcoArk Design offers rapid‑turnaround LCAs, material vetting and embodied‑carbon action plans. Schedule a consult.

Suggested Internal Links: /services/lca, /case‑studies/quay‑quarter, /blog/net-zero-buildings-australia

Categories: Uncategorized

0 Comments

Leave a Reply

Avatar placeholder

Your email address will not be published. Required fields are marked *